All Services — Operational

Ground to
Grid.
Protected.

From Wenner 4-pin soil resistivity surveys to full earthing grid installation with CPRI-format test reports — we deliver IS 3043-compliant earthing and NFC 17-102 lightning protection as a single managed scope.

17+
Years Experience
10K+
Distributors
3
Mfg Setups
PAN
India Reach
Lightning protection installation work
On-Site Execution
IS 3043-Compliant
Earthing Execution
Electrode installation, BFC backfilling, copper strip routing, exothermic welding, and digital earth resistance verification — delivered with CPRI-format documentation for every earth pit.
Industrial earthing project support
Substations to railways. Data centres to factories.Turnkey supply, installation, testing, and maintenance for earthing systems across India's most demanding project environments.
Selected Work Sites
Mira Gaon Metro Station
Kotak
Domino's
Matoshree Bungalow
System Metrics
ACTIVE_PROJECTS
47
ENGINEERS_ON_SITE
1,000+
STATES_COVERED
28
SATISFACTION_RATE
99.7%
CPRI_COMPLIANCE
100%
Delivery on Schedule94%
Client Retention97%
Quality Pass Rate99%
RDSO Approved
CPRI Certified
UL Listed
ISO 9001:2015
IS:3043 Compliant
Make In India

Comprehensive
Infrastructure Solutions

6 Services
Supply Only
Supply Only
SVC_001
Direct supply of CPRI-certified electrodes, BFC compound, earth pit covers, lightning arresters, and grounding accessories — dispatched within 48 hours for urgent projects
Bulk pricing for contractors. 10,000+ distributor network ensures availability across India.
Explore Service
Installation Services
Installation Services
SVC_002
On-site earthing pit excavation, electrode driving, BFC backfilling, copper strip routing, and earth resistance verification by certified technicians
Our teams follow IS 3043 installation guidelines and provide CPRI-format test reports for every pit.
Explore Service
Supply & Installation
Supply & Installation
SVC_003
Turnkey earthing execution — from material procurement and site delivery to installation, testing, and compliance certification under a single contract
Eliminates multi-vendor coordination. One team handles materials, labour, and documentation.
Explore Service
Testing & Certification
Testing & Certification
SVC_004
Digital earth resistance measurement using calibrated 4-point Wenner method testers. CPRI-format compliance reports issued for every installation
Testing frequency: annual for standard sites, semi-annual for corrosive or high-moisture environments.
Explore Service
Site Assessment
Site Assessment
SVC_005
Soil resistivity survey using Wenner 4-Pin method, geological analysis, and electrode configuration design to achieve target ≤1Ω earth resistance
Determines optimal electrode type, depth, spacing, and BFC quantity based on measured soil resistivity.
Explore Service
Maintenance Plans
Maintenance Plans
SVC_006
Scheduled annual or semi-annual earthing system inspections — including resistance re-testing, electrode condition checks, and BFC top-up recommendations
Preventive maintenance extends system lifespan from 15 years to 30+ years. Includes digital log reports.
Explore Service

Trusted Across
Active Sites

From JSW Steel's manufacturing complex to Mumbai Metro stations — our certified teams have delivered earthing grids, lightning protection, and compliance documentation across India's most critical infrastructure.

Work_01
Mira Gaon Metro Station
Work_02
Kotak
Work_03
Domino's
Work_04
Matoshree Bungalow
Work_05
BRCAC
Work_06
Metallurgical Chemical Product Ltd
Work_07
JSW Steel
Work_08
Indian Oil
Work_09
Deepak Fertilizers
Work_10
Shapoorji Pallonji

Click A Service.
See The Work.

Supply Only
Live Work Highlights
Supply Only
Fast Supply. Clean Dispatch. Site-Ready Materials.
Supply Only visual 2
Supply Only visual 3
Service_01

Supply Only

For urgent and scheduled jobs, we organize dependable supply of core earthing materials with the right combinations of chambers, electrodes, arresters, and accessories.

Product matching based on site requirement
Coordinated dispatch for project timelines
Bulk and repeat supply for contractors and facility teams
Selected Work
KotakDomino'sIndian Oil
Installation Services
Live Work Highlights
Installation Services
Installation Teams That Understand Real Ground Conditions.
Installation Services visual 2
Installation Services visual 3
Service_02

Installation Services

We execute earthing and lightning protection installation with strong site discipline, neat routing, reliable terminations, and inspection-friendly finishing.

On-site earthing pit and chamber installation
Lightning arrester mounting and connection work
Practical finishing for service and maintenance access
Selected Work
Mira Gaon Metro StationMatoshree BungalowShapoorji Pallonji
Supply & Installation
Live Work Highlights
Supply & Installation
Complete Supply And Installation Under One Execution Flow.
Supply & Installation visual 2
Supply & Installation visual 3
Service_03

Supply & Installation

When projects need speed and accountability, we handle both product delivery and field execution so timelines stay tighter and coordination stays simpler.

Single-vendor coordination for grounding scope
Faster project movement with fewer handoffs
Aligned materials, installation, and site support
Selected Work
JSW SteelDeepak FertilizersIndian Oil
Testing & Certification
Live Work Highlights
Testing & Certification
Testing That Gives Confidence Before Handover.
Testing & Certification visual 2
Testing & Certification visual 3
Service_04

Testing & Certification

We support project teams with earthing checks and practical validation so systems are ready for inspection, maintenance planning, and safe operation.

Earth resistance verification support
Inspection-ready documentation assistance
Maintenance and compliance-oriented review
Selected Work
BRCACKotakMetallurgical Chemical Product Ltd
Site Assessment
Live Work Highlights
Site Assessment
Better Designs Start With Better Site Understanding.
Site Assessment visual 2
Site Assessment visual 3
Service_05

Site Assessment

Our site assessment approach helps teams choose the right earthing arrangement, chamber style, and product mix for the actual project environment.

Initial site condition understanding
Product and layout suitability guidance
Support for practical installation planning
Selected Work
Mira Gaon Metro StationJSW SteelShapoorji Pallonji
Maintenance Plans
Live Work Highlights
Maintenance Plans
Maintenance Planning For Long-Life Grounding Systems.
Maintenance Plans visual 2
Maintenance Plans visual 3
Service_06

Maintenance Plans

For active sites and operating facilities, we help teams maintain inspection access, spot wear early, and protect long-term grounding performance.

Periodic inspection support
Chamber access and component review
Planning for upkeep on critical installations
Selected Work
Indian OilDeepak FertilizersKotak
Manufacturing Facility 1Manufacturing Facility 2Manufacturing Facility 3Manufacturing Facility 4Manufacturing Facility 5Manufacturing Facility 6
500+
Clients
40+
Centers
10K+
Distributors

Infrastructure &
Delivery

Complete control over quality through 3 in-house manufacturing units with CNC electrode forming, automated copper electrolysis, and CPRI-grade testing labs. Backed by 10,000+ distributors for 48–72 hour dispatch across India.

CNC & Automated Manufacturing
CNC electrode forming machines, automated copper electrolysis lines, and precision dimensional inspection at 3 dedicated facilities.
Rapid PAN India Delivery
10,000+ authorized distributors ensure CPRI-certified earthing materials reach any project site within 48–72 hours.
1,000+ Trained Technicians
Certified installation teams executing IS 3043-compliant ground installations with CPRI-format testing and documentation.

Frequently
Asked
Questions

Immediate answers on earthing practices, soil resistivity, and installation compliance.

Technical Support
Our engineering desk handles electrode sizing, BFC calculations, soil resistivity analysis, and earthing grid design for complex geological conditions.
Contact Engineer
Q01
What earth resistance value should my installation achieve?
Per IS 3043, the earth resistance at the main earthing busbar should be ≤1Ω for power installations and ≤2Ω for general buildings. For sensitive equipment like data centres or hospitals, we recommend ≤0.5Ω. Multiple earth pits with parallel electrodes and BFC compound can be used to achieve lower values in high-resistivity soil.
Q02
How often should earthing systems be tested?
Annual testing is mandatory for industrial installations per IS 3043. For environments with corrosive soil, chemical exposure, or heavy monsoon seasons, we recommend semi-annual testing. Post-lightning-strike testing is also essential. Our digital earth testers provide precise 4-point Wenner method readings.
Q03
What certifications do your products hold?
All our electrodes are CPRI (Central Power Research Institute) tested and RDSO approved for railway applications. Lightning arresters comply with NFC 17-102 and IEC 62305. Manufacturing is ISO 9001:2015 certified. Copper bonded rods are UL Listed. Every product ships with test certificates.
Q04
Do you handle installation across India?
Yes. We have 1,000+ trained installation technicians and a distributor network spanning 28+ states. For turnkey projects, our teams handle site survey, electrode installation, BFC backfilling, earth strip routing, exothermic welding, and CPRI-format testing reports — delivered as a single package.

Don't Compromise
On Safety.

Contact Vansh Earthing for certified solutions that protect your people, equipment, and facilities.